Resurfacing

Every spring, the Engineering team completes the annual asphalt street pavement condition survey. From this survey, the annual Street Resurfacing Priority List is developed based on the observed condition of the streets. The list is used as a guide for the preparation of the annual street resurfacing contract. A brief explanation of the priority system is as follows:

  • Priority 1 - Street requires resurfacing as soon as possible
  • Priority 2 - Street requires resurfacing in the next one to two years
  • Priority 3 - Street should be surveyed every year, maintenance procedures may extend time until resurfacing required, resurfacing necessary in approximately two-four years
  • Priority 4 - Street in fair condition, survey condition again in two years
  • Priority 5 - Street in good condition, survey condition again in three years

Click Image to View

2023 Map Prelim Major Road Projects

The “Type” column of the list indicates which method of resurfacing will be done. “R” indicates the method by which the existing surface is heater scarified and rejuvenated and a thin (1”– 11/4”) bituminous wearing surface is added. “M/O” denotes a method by which an optimum thickness (11/2” – 2½”) of the existing surface is milled off and a new surface of approximately equal thickness is added. “O” represents a straight overlay method where the existing surface is leveled with thin layer of bituminous material and then a 11/2” – 2” bituminous overlay is laid.

For questions please contact:

Eric Herbst, P.E.

(309)454-9744


2023 Street Resurfacing Schedule (WEATHER PERMITTING)


Street

Milling                    
Crack Cleaning
and Filling
Reflective Crack Control Fabric Longitudinal
Joint Sealant

Tack Coat          
Asphalt Paving
Binder Course
Asphalt Paving
Surface Course
E. College Ave (Blair Dr. To Young Dr.) Complete Complete Complete Complete Complete Complete
MON 9/25-  WED 9/27
Market St (Adelaide St. To Samantha St.) TBD N/A N/A TBD TBD TBD TBD
Samantha St. (Market St. To Kern St.) TBD N/A N/A TBD TBD TBD TBD
Madison St. (Division St. To Apple St.) TBD N/A N/A TBD TBD TBD TBD
Apple St. (Madison St. To Main St.)  TBD N/A N/A TBD TBD TBD TBD
S. University St. (Division St. To Apple St.) TBD TBD N/A TBD TBD TBD TBD
W. Virginia Ave. (Center St. To Main St.) TBD N/A N/A TBD TBD TBD TBD
Aurora Way (Miles Ln. To Alden Dr.) TBD N/A N/A TBD TBD TBD TBD
Payne Place TBD N/A N/A TBD TBD TBD TBD
Park Drag Lane Complete N/A N/A FRI 10/6 THU 9/28, FRI 10/6 MON 10/2-TUE 10/3 MON 10/9- TUE 10/10
Cutter Court Complete N/A N/A FRI 10/6
THU 9/28, FRI 10/6
MON 10/2- TUE 10/3 MON 10/9- TUE 10/10
Carriage Hills Rd. (White Chapel Way To Beech St.) Complete N/A N/A FRI 10/6 THU 9/28, FRI 10/6 MON 10/2- TUE 10/3 MON 10/9-TUE 10/10
Beech St. (Phaeton Pl. To Raab Rd.) Complete MON 9/25- TUE 9/26 THU 9/28 FRI 10/6 FRI 10/6 MON 10/2-TUE 10/3 MON 10/9
Stephens Drive TBD N/A N/A TBD TBD TBD TBD
Maplewood Dr. (Stephens Dr. To Belt Ave.) TBD N/A N/A TBD TBD TBD TBD
Boone Court TBD N/A N/A TBD TBD TBD TBD
Belt Ave. (bridge SE of Maplewood Dr. To Maple Pl.) TBD N/A N/A TBD TBD TBD TBD
Maple Pl. (Stephens Dr. To Maplewood Dr.) TBD N/A N/A TBD TBD TBD TBD
Mark Lane  TBD N/A N/A TBD TBD TBD TBD
Smith Dr. TBD N/A N/A TBD TBD TBD TBD
Crescent Ln. (Maple Pl. To Jersey Ave.) TBD N/A N/A TBD TBD TBD TBD
Ruston Ave. TBD N/A N/A TBD TBD TBD TBD
Orlando Ave. (Main St. to School St.) TBD N/A N/A TBD TBD TBD TBD
Miles Lane TBD N/A N/A TBD TBD TBD TBD
Gregory St. (School St. To Fell Ave.) TBD N/A N/A TBD TBD TBD TBD
N. Fell Ave. (Sycamore St. To Lincoln St.) TBD N/A N/A TBD TBD TBD TBD
Norwood Ave. (Fell Ave. To Lincoln St.) TBD N/A N/A TBD TBD TBD TBD
Dial Court TBD N/A N/A TBD TBD TBD TBD
Douglas St. (Cole St. To Oglesby Ave.) TBD N/A N/A TBD TBD TBD TBD
Lincoln Ave. (Cole St. To Oglesby Ave.) TBD N/A N/A TBD TBD TBD TBD
Oglesby Ave. (Beech St. To Lincoln Ave.) TBD N/A N/A TBD TBD TBD TBD

Please note that the dates above may change and work may be delayed due to weather.


Parallel parking on the street will be prohibited and streets will be subject to lane closures during the milling, priming, and asphalt paving operations.  Temporary No Parking signs will be posted as needed in the afternoon or early evening of the day before each operation is scheduled.  Please watch for these signs as no other notice will be provided.  On days when surface course is placed, lanes will be closed, with access to driveways and parking lots unavailable, until the new asphalt has adequately cooled, usually 1-2 hours but potentially up to 4-5 hours.  We do not anticipate lanes being closed overnight.   If you need to ensure use of your vehicle the day(s) the surface course is placed on your street, you will need to park elsewhere before 7:00 a.m.